Convert the four open TODO items into executable phases (append mode,
starting at 190 after the completed 189):
190_app_name_settings_fix - the Settings-panel app name wins over the
Theme tab; the three brand strings stripped from the Theme tab
(colors-only); live brand re-apply on save, no reload
191_source_name_labels_tags - source_labels table + admin API + Sources
page editor; the separate bounded source_name_hit_bonus retrieval
boost; label surfacing in the <document> blocks and KB overview
192_verbatim_inline_midturn - an additive verbatim_block SSE frame at
the show_text success moment; in-place mid-turn fence hydration;
the done/restore per-locator dedupe; the done frame, record key,
restore and shared page stay byte-identical
193_sync_remaining_count - the running sync/upload label counts down:
"N remaining" (N = total - done), hidden at the final file; the
chunk/image/summaries/terminal parts untouched
TODO.md is cleared (its items now live in .agents/phases/todo/).
LLM-Generated: true
2 lines
7 B
Markdown
2 lines
7 B
Markdown
# TODO
|