Commit Graph
5 Commits
Author SHA1 Message Date
ducoterra 3b2dea5685 phase: 102_extensionless_filenames
Build and Push Containers / build-and-push-app (push) Successful in 1m38s
Build and Push Containers / build-and-push-db (push) Successful in 13s
All verification complete — every gate green, no defects found in previously completed work.

**Phase 102 final verification pass — report**

Verified (all three task files present in `complete/`; working-tree implementation matches D1–D5 design):
- `match_extension` choke point in `app/rag/importer.py` (walk + `formats` counter), `doc_format` name-token badge in `app/api/docs.py`, config/`.env.example` docs, fixture `tests/fixtures/extensionless_kb/`, integration + E2E suites — all present and correct
- Completion criteria: end-to-end sync (✓ integration + E2E), case matrix incl. `mydockerfile`/`Dockerfile.dev`/`.dockerfile` exclusions (✓ unit), `formats=dockerfile:1` not `unknown` (✓ log-line assertion), badge `dockerfile`/`containerfile` + `text` fallback + suffixed unchanged (✓ unit/integration/E2E), prune-on-token-removal (✓ `pruned==2`), suffixed-path rule byte-identical (✓ single-line swap, existing cases untouched)

Test / lint results (exact commands):
- `uv run pytest --cov=app --cov-report=term-missing` → 2084 passed, **99%** coverage (>90% gate)
- `uv run pytest tests/e2e/test_extensionless_import.py -v --no-cov` → 2 passed, isolated, DB up
- Regressions isolated: `test_import_documents` 3✓, `test_import_extensions_env` 2✓, `test_quadlet_jinja_import` 4✓, `test_document_viewer` 7✓, `test_kb_tree` 8✓
- `uv run ruff check .` → clean; `uv run pyright` → 0 errors, 0 warnings

Notable: commit intentionally not made (harness commits the phase); 102's task files already sit in `complete/`, overview stays in `todo/` for the harness.
Next pending phases: 98, 99, 103, 104, 105 (numeric next after 102: `103_suggestions_session_openers`).
2026-09-12 15:56:43 -04:00
ducoterra 7fce6572d0 feat: phases 77–80 — navbar view refresh, static background, API tokens, history suggestion chips
Build and Push Containers / build-and-push-app (push) Successful in 1m45s
Build and Push Containers / build-and-push-db (push) Successful in 13s
Single consolidated commit for four completed, validated phases (77, 78,
79, 80). The pipeline run left all work uncommitted because the harness
commits only with PHASE_COMMIT=1 while child executors are forbidden from
committing; the phases themselves all passed validation and moved to
.agents/phases/complete/.

Phase 77 — navbar view refresh
- router.js dispatches bor:view-refresh on re-show / active re-click /
  popstate (gated on wasMounted; first show and boot exempt)
- History / RAG / Sources / Tuning re-fetch on refresh (admin branch);
  Chat deliberately excluded (stream survival)
- History "Refresh" button (admin-only, in-flight disable + status line)
- New story suite tests/e2e/test_navbar_refresh.py (7 tests)

Phase 78 — static background
- Removed the animated glow layers; static 44px grid over the flat --bg
  canvas; default and reduced-motion renders byte-identical
- Updated background/theme E2E suites; removed bg-glow test pins

Phase 79 — API tokens
- api_tokens model + migration 0012; hash-only token service
- Admin tokens API + Tokens admin view; POST /api/token-auth;
  live-revoking require_user on chat / suggestions / document content
- Frontend token gate with localStorage cache; anonymous E2E suites
  migrated to token login
- New story suite tests/e2e/test_api_tokens.py (9 tests)

Phase 80 — history suggestion chips
- last_questions() endpoint with SEED fallback; startNewChat() refetch
- Seed-semantics docs (config.py, .env.example, README)
- Integration state matrix + E2E suite rewritten to the 4 chip states

Also included: phase-76 report artifacts and the repo restore-test-db
skill (previously untracked), scripts/* ruff fixes from phase 77.

Final gate state (phase 80 final pass, covers everything above):
- uv run pytest --cov=app → 1637 passed, 0 failed, app/ coverage 99%
- uv run ruff check . && uv run pyright → clean, 0 errors
- Per-phase story E2E suites green in isolation
2026-09-07 12:39:01 -04:00
ducoterra 140b97ebf3 feat(kb): edit + re-embed document summaries from the viewer (admin) 2026-08-31 23:52:22 -04:00
ducoterra 9efffcb428 feat(viewer): show document summary together with the original (TODO.md L5) 2026-08-26 19:11:15 -04:00
ducoterra 6ec6181c7b feat(ui): clickable document viewer — open any cited document in the browser from chat chips and the sources table 2026-08-22 02:08:49 -04:00