ducoterra
|
ad7585d474
|
phase: 97_kb_tree_catalog
Build and Push Containers / build-and-push-app (push) Successful in 2m11s
Build and Push Containers / build-and-push-db (push) Successful in 11s
All completion criteria verified — everything is green, no defects found. Final report:
## Phase 97 final verification pass — ALL GREEN
**Verified (no code changes needed):**
- `GET /api/docs/tree` (admin), `build_kb_tree` pure builder, `PATCH /api/folders/summary`, migration 0018 (`manually_edited`, head confirmed), generator skip/keep + `kept_manual` stat, RAG tree UI + edit affordance in `sources.js`/`index.html`/`styles.css`
- `tests/e2e/test_kb_tree.py`: 8 passed — top level, drill source/folder, edit round-trip, clear, manual-desc-survives-sync, reload fallback, anonymous gate
- Integration: tree shape/order/403/empty/indexed-only + PATCH update/create/root/clear/404/403/no-LLM + stat-walk equivalence (in `test_docs_api.py`); 3-field `folder_summaries=` import token preserved
**Gates (exact commands):**
- `uv run pytest --cov=app --cov-report=term-missing` → **2053 passed**, TOTAL coverage **99%** (>90% ✓)
- `uv run ruff check . && uv run pyright` → **All checks passed / 0 errors**
- `uv run pytest tests/e2e/test_kb_tree.py -v --no-cov` → **8 passed** in isolation
- 30 story/RAG-view E2E suites run **one per process**: all passed, incl. `test_ls_tree_drilldown` (agent `ls` byte-identical ✓), `test_import_documents`, `test_edit_summaries`, `test_admin_auth`, `test_kb_overview`
**Completion criteria:** tree view ✓ · edit round-trip + clear ✓ · manual persists/clear resets ✓ · `ls` unchanged ✓ · pytest/coverage/lint ✓ · E2E isolation ✓ · commit — left to harness per protocol (working tree untouched, `git add/commit` not run)
**Deviations:** none. **Next pending phase:** none — `todo/` contains only 97 (96 already committed).
|
2026-09-11 22:48:02 -04:00 |
|
ducoterra
|
9188be259b
|
phase: 93_theme_semantic_completion
Build and Push Containers / build-and-push-app (push) Successful in 1m56s
Build and Push Containers / build-and-push-db (push) Successful in 11s
All verification is complete. Final report:
**Phase 93 — Theme semantic completion: FINAL VERIFICATION PASS — ALL GREEN**
- Verified full implementation in tree: migration `0016` (8 nullable semantic columns, applied at head), 17-var `BUILTIN_COLORS`/`COLOR_FIELDS`/`effective_settings`, API validation, `#view-theme` State-colors fieldset (17 pickers), `theme.js` FIELDS/PAIRS (5→8), `.page-head` surface panel (6 shell views + doc-edit + shared.html; login card / document sticky header audited as already-surfaced), mock_llm `content: None` fix
- Fixed 2 pre-existing defects (both fail identically on baseline `d4f38ad`, proven via worktree A/B): `test_nav_rename_sources` — expected nav tail missing the phase-91 "Theme" link; `test_stale_ui_copy` — now truncates `saved_chats` before/after (house `test_suggestion_chips` pattern) so the seed-chip contract is deterministic on the shared dev DB (owner's 22 saved chats triggered phase-80 last-3-questions)
- Tests: `uv run pytest --cov=app --cov-report=term-missing` → **1868 passed, app/ 99%** (>90% ✓); `uv run ruff check .` → clean; `uv run pyright` → **0 errors**
- E2E: dedicated `uv run pytest tests/e2e/test_theme_semantic_completion.py -v --no-cov` → **8/8 in isolation** (all-gray 17-color theme: zero residual color on saved-result/Stale/Revoked/Local/tool-call elements, text labels intact, gray heads non-transparent, pre-paint tag, Reset → byte-identical no-tag); 15 theme/header/nav/responsive suites green in isolation; full 85-file combined run: only the 2 fixed pre-existing failures + 1 combined-run artifact (`test_sync_upload_progress`, green in isolation)
- Completion criteria: (1) monochrome E2E ✓ (2) default byte-identical, no `#bor-theme` tag ✓ (3) all page heads on solid surface ✓ (4) suite/coverage/lint/E2E green ✓ (5) phases 01–92 no behavior change ✓ (6) commit left to harness per protocol
- Notable: cleaned stray uvicorn leftovers from prior implementation pass (owner's `--reload` dev server untouched); no deviations from the phase design
- Next pending phase: `94_ls_tree_drilldown`
|
2026-09-10 16:43:08 -04:00 |
|