phase: 04_huntington_role
**Phase 04 final verification — all green**

Implemented/verified
- Both phase tasks already complete (`complete/04_huntington_role/01`,`02`); this pass was final verification + docs.
- `src/index.html` HNB "Lead MLOps Engineer · Jun 2026 – Present" entry first with 3 bullets; Nimbis closed at `Jan 2022 – Apr 2026`.

Tests / lint / gate
- `./build.sh` → `dist/` rebuilt (9 hashed assets) · `npm test` → **47 passed, 0 failed**
- `bash .agents/validate.sh` → **exit 0**: 47/47 E2E, `HEADER CHECK PASSED` (real podman image, `/`, `/index.html`, hashed css), hygiene checks clean
- `node --check` all `src/*.js` + `tests/e2e/*.js` + `playwright.config.js` OK; `bash -n` on `build.sh`, `scripts/check-headers.sh`, `.agents/validate.sh` OK (no JS lint toolchain by design)

Completion criteria
- `grep -c "Huntington National Bank" dist/index.html` = **1**; `Jun 2026 – Present` at dist:118 — PASS
- Nimbis `Jan 2022 – Apr 2026` at dist:138; only one `– Present` in file — PASS
- Regression test `experience timeline leads with Huntington National Bank role` present at `tests/e2e/01-page.spec.js:28` and passing — PASS
- `./build.sh && npm test` fully green (47 ≥ 45) — PASS · No behavior change: terminal/vim/achievements/menu specs all pass — PASS
- Coverage >90% on new/modified code: vacuous (HTML + test only, no JS/CSS touched) — PASS

Documentation (fixed)
- README: `check-headers.sh` claimed "aborting at the first failing path" — it actually checks all three paths then exits non-zero; also added the real webServer command (`--bind 0.0.0.0`) and `npm run test:headed`.
- AGENTS.md: `innerHTML` allowance scoped precisely (only the `cmdText === 'neofetch'` branch in terminal.js; vim/achievements only static or `escapeHtml()`-escaped).

Notable: `.agents/PLAN.md` §4/§5 still say "44 tests" (now 47) — PLAN.md is locked to me; flagged for user approval.

Next pending phase: `.agents/phases/todo/05_update_projects_section`
2026-10-23 00:36:58 -04:00

2.8 KiB
Raw Blame History

Phase 04 — Add Huntington National Bank role to work experience

Story: n/a Context: src/index.html #experience timeline, .agents/PLAN.md §2 (static-first — content-only change, no new technology)

Objective

Update the work-experience timeline with the user's current role: Lead MLOps Engineer at Huntington National Bank (Jun 2026 – Present), inserted as the new first (most recent) timeline entry with three bullet points covering the agentic vulnerability-remediation toolkit, LLM harness skills for business automation, and the 6-person offshore team building the developer landing zone. The previous Nimbis "DevOps Manager" entry is updated from Jan 2022 – Present to Jan 2022 – Apr 2026. Lock the change with a Playwright regression test.

Dependencies

— (none)

Tasks

  1. 01_add_timeline_entry.md — Insert the new Huntington National Bank timeline entry at the top of the #experience timeline and update the Nimbis DevOps Manager end date.
  2. 02_experience_regression_test.md — Add a Playwright test proving the new entry is first, complete, and correctly dated, and that the Nimbis entry no longer claims "Present".

Testing & Quality

  • Unit/integration: no JS logic changes in this phase — src/index.html content only. The quality gate is the E2E regression test (task 2) plus the full suite.
  • Coverage: >90% on new/modified code — vacuously satisfied (no JS/CSS/TS code is modified); the E2E suite is the binding gate.
  • E2E: full Playwright suite (npm test) green.
  • The phase is "Complete" only when the entire project test suite passes 100% (every test in the project, not just this phase's — pre-existing failures included) and achieves >90% code coverage on new/modified code.

Documentation & Consistency

  • The final pass reviews README.md and AGENTS.md in full against the project as it stands after this phase — fixing every inconsistency found, including pre-existing ones not caused by this phase.
  • Tasks update README.md/AGENTS.md immediately when their own changes are user-visible (setup, commands, configuration, features, conventions).

Completion Criteria

  • grep -c "Huntington National Bank" dist/index.html returns 1 and grep -n "Jun 2026" dist/index.html shows the – Present date span
  • Nimbis "DevOps Manager" date reads Jan 2022 – Apr 2026 in dist/index.html (no second – Present entry in #experience)
  • new regression test present in tests/e2e/01-page.spec.js and passing
  • ./build.sh && npm test fully green (45+ tests)
  • no behavior change in completed work (terminal, vim, achievements, menu)
  • README.md and AGENTS.md are accurate and consistent with the whole project (verified in the final pass)