Files
brain-of-reese/app
ducoterra fcac876d40
Build and Push Containers / build-and-push-app (push) Successful in 2m26s
Build and Push Containers / build-and-push-db (push) Successful in 13s
phase: 134_sync_cancel
**Phase 134 final verification pass — all green** (all 3 task files already in `complete/`; no implementation was missing)

- Verified: 5-state `SyncStatus` + `cancelled` terminal (error None, final counts kept), `POST /api/sync/cancel` (202/409/403), cooperative `_check_cancelled` boundaries, shutdown `CancelledError` contract preserved, `#sync-cancel-btn` show/hide + neutral "Sync cancelled" settle, 8-branch poll tree, re-attach — code, unit, integration, and E2E layers all present
- `uv run pytest --cov=app --cov-report=term-missing` → **3150 passed**, `app/` coverage **99%** (gate: >90%)
- `uv run pytest tests/e2e/test_sync_cancel.py -v --no-cov` (isolated) → **3 passed** (47.6 s)
- `uv run ruff check .` → clean; `uv run pyright` → 0 errors, 0 warnings

**Completion criteria:** ① cancel endpoint 202/409/403 ✅ (unit + E2E) ② `cancelled` terminal reported by status, error null, counts kept ✅ (integration `test_cancel_mid_run_lands_in_cancelled_then_resyncs_clean`) ③ unrequested-cancel pin ✅ (`test_unrequested_cancel_is_never_swallowed_and_never_converts`) ④ UI lifecycle + clean re-sync (sentinel row, full 40-file import) ✅ (E2E) ⑤ suite/coverage/E2E gates ✅ ⑥ uncancelled runs byte-identical ✅ (all 3150 pre-existing tests green untouched)

- Docs: README.md reviewed in full against code (pages, auth endpoints, every config default vs `app/config.py`, palette 9+8, fail-loud, cancel section) — consistent, no changes needed. AGENTS.md: fixed one pre-existing inaccuracy (rule 2 "move its file" → "move its directory" — phases are directories); everything else verified accurate
- No live infrastructure touched; no deviations

**Next pending phase:** `135_git_source_branch`
2026-09-28 18:08:11 -04:00
..
2026-09-28 18:08:11 -04:00
2026-09-25 05:19:18 -04:00
2026-09-28 15:39:52 -04:00
2026-09-26 17:06:09 -04:00
2026-09-14 15:55:13 -04:00
2026-09-25 05:19:18 -04:00
2026-09-27 05:53:12 -04:00
2026-09-28 11:49:55 -04:00