ducoterra
42a4222949
phase: 81_login_rate_limit
All gates verified. The phase is complete — everything was already implemented by prior task runs; this pass verified each completion criterion end-to-end and found no defects.
**Phase 81 final verification report** (tasks 01–03 all present in `complete/`; no code changes needed this pass)
- Verified: `app/core/rate_limit.py` (stdlib sliding window, fail-open) + both login routes' 429 pre-check/record/reset wiring + all unit/integration pins present (11th-429, blocked-success-still-429, clean-counter reset, shared counter, autouse `clean_rate_limit` fixture documented).
- Live check (task 03): dev server + 11 rapid wrong logins → `401 ×10, 429`; 429 body carries `retry-after: 900` + generic detail; server restarted (per-process counter cleared by design).
- `uv run pytest tests/unit/test_rate_limit.py -v --no-cov` → 10 passed
- `uv run pytest --cov=app --cov-report=term-missing` → 1652 passed, **TOTAL 99%** (>90%; rate_limit.py 100%, auth.py 100%)
- `uv run pytest tests/e2e/test_smoke.py -v --no-cov` (isolation) → 3 passed
- `uv run ruff check . && uv run pyright` → All checks passed / 0 errors, 0 warnings
- Completion criteria: all met, except commit + phase-dir move — per harness rules I left all changes uncommitted in the working tree (harness commits atomically and moves the phase).
- Diff scope: exactly `app/core/rate_limit.py`, `app/api/auth.py`, `tests/unit/test_rate_limit.py`, `tests/integration/test_auth_api.py` + phase files; `pyproject.toml` / `uv.lock` / `frontend/` untouched.
- Deviations: none in code; commit/move deferred to harness as instructed.
- Next pending phase: `82_security_headers`.
2026-09-07 23:08:46 -04:00
..
2026-09-05 16:04:40 -04:00
2026-09-07 12:39:01 -04:00
2026-08-28 15:57:59 -04:00
2026-09-07 12:39:01 -04:00
2026-09-07 12:39:01 -04:00
2026-09-07 12:39:01 -04:00
2026-09-07 12:39:01 -04:00
2026-09-07 12:39:01 -04:00
2026-09-07 12:39:01 -04:00
2026-08-28 07:02:24 -04:00
2026-09-05 16:04:40 -04:00
2026-08-21 13:42:21 -04:00
2026-08-21 13:42:21 -04:00
2026-09-01 03:52:03 -04:00
2026-09-01 03:52:03 -04:00
2026-09-07 12:39:01 -04:00
2026-09-06 06:31:31 -04:00
2026-09-02 10:52:38 -04:00
2026-09-05 14:34:33 -04:00
2026-09-07 14:16:41 -04:00
2026-08-29 18:32:15 -04:00
2026-09-07 14:16:41 -04:00
2026-09-03 11:17:47 -04:00
2026-08-27 01:04:16 -04:00
2026-09-01 03:52:03 -04:00
2026-09-07 14:18:45 -04:00
2026-09-06 06:31:31 -04:00
2026-09-06 06:31:31 -04:00
2026-09-05 16:04:40 -04:00
2026-09-01 23:51:43 -04:00
2026-09-03 13:39:15 -04:00
2026-08-26 22:39:14 -04:00
2026-09-03 11:17:47 -04:00
2026-08-25 22:42:10 -04:00
2026-08-28 03:35:50 -04:00
2026-09-03 11:17:47 -04:00
2026-09-01 03:52:03 -04:00
2026-08-25 20:22:51 -04:00
2026-09-02 01:08:18 -04:00
2026-09-04 13:11:07 -04:00
2026-09-07 23:08:46 -04:00
2026-09-06 06:31:31 -04:00
2026-09-05 10:26:39 -04:00
2026-09-05 16:59:31 -04:00
2026-09-07 12:39:01 -04:00
2026-09-03 13:39:15 -04:00
2026-09-07 12:39:01 -04:00
2026-09-01 00:39:19 -04:00
2026-09-02 15:55:33 -04:00
2026-08-30 23:39:15 -04:00
2026-08-29 18:32:15 -04:00
2026-09-03 11:17:47 -04:00
2026-09-06 06:31:31 -04:00
2026-08-22 16:44:42 -04:00
2026-09-06 06:31:31 -04:00
2026-08-25 13:46:32 -04:00
2026-09-01 04:20:26 -04:00
2026-08-25 17:48:37 -04:00
2026-08-31 23:52:22 -04:00
2026-09-06 06:31:31 -04:00
2026-08-27 23:44:35 -04:00
2026-09-01 12:04:06 -04:00
2026-08-28 17:10:02 -04:00
2026-09-07 12:39:01 -04:00
2026-09-07 12:39:01 -04:00
2026-09-01 03:52:03 -04:00