chore(agent): phase 93-95 roadmap from TODO.md — theme completion, ls tree drill-down, read truncation cap
Convert the three unchecked TODO.md items into an executable phase roadmap (Protocol B, appended after phase 92): - 93_theme_semantic_completion (TODO L3): the ok/err/accent state families become Theme-tab-controlled (B3 revised, owner permission 2026-09-10) + surface panels behind every page head - 94_ls_tree_drilldown (TODO L4): ls becomes a source -> folder -> file tree with sync-time lite-model folder summaries; controlled tool-calling battery as the accuracy/performance gate - 95_read_truncation_cap (TODO L5): read capped at BOR_READ_MAX_CHARS (128k chars ~= 32k tokens, spec'd on the 128k-token minimum context), LLM-visible truncation notice pointing at grep, new tool_result SSE event (A15 extension) + the visible UI marker Owner decisions (B3 / A7 scope / A15) are recorded in the phase files; .agents/PLAN.md is being redone separately per the owner.
This commit is contained in:
Binary file not shown.
|
After Width: | Height: | Size: 178 KiB |
Reference in New Issue
Block a user